Windows Server 2016 replacement in Las Vegas, before end of support
If a Windows Server 2016 machine still runs production, the hard part is rarely choosing what to move to. It is moving it without downtime, on a team that is already stretched. Microsoft ends extended support for Windows Server 2016 on January 12, 2027; after that date the server gets no more security updates unless you pay for Extended Security Updates.
Days Dynamics inventories what runs on each server, recommends a path server by server, supplies the hardware and licensing, and manages the migration and cutover as one project with one contract. Organizations in Las Vegas, Henderson, North Las Vegas, and Boulder City get on-site cutover; projects elsewhere are handled remotely with local installation help.
Does this sound like your server?
- Everyone knows it has to move, but nobody has the hours to plan the cutover.
- Updating it means taking production down, so the work keeps getting pushed.
- A server in the office still runs Windows Server 2016 and holds files, a database, or a line-of-business application.
- Your practice management, school information, point-of-sale, or ERP software runs on that server.
- The server hardware is out of warranty, or nobody knows how old it is.
- A cyber insurer, auditor, or customer has asked whether your systems are still supported.
- You are not sure whether the workload should stay on site or move to the cloud.
- The person who set the server up has left, and the configuration is undocumented.
What the engagement covers
- An inventory of every Windows Server 2016 machine and what runs on it.
- A path for each server: replace on site, move to Microsoft Azure, consolidate, or bridge with paid updates.
- Server hardware and Windows Server 2025 licensing, including user or device access licenses.
- Confirmation from your software vendors that their applications support the new version.
- A migration plan with a full backup and a tested restore before anything moves.
- Cutover scheduled after hours, with a rollback plan if something does not start.
- Secure retirement of the old server and its drives.
What does a Windows Server 2016 replacement cost?
A typical on-site server replacement for an organization of 25 to 150 users runs $10,000 to $30,000 per server, all in: hardware, licensing, migration, and cutover.
| What | Typical range | What sets it |
|---|---|---|
| All-in replacement, per server | $10,000 to $30,000 | Hardware, Windows Server 2025 licensing and access licenses, migration, and after-hours cutover, for 25 to 150 users. Larger databases, clustering, or several sites cost more. |
| Decision Snapshot (first step, up to 10 servers) | $1,500 fixed | A recommended path and budget range for each server in five business days. Paid at booking, refunded in full if not delivered by the date confirmed in writing, and credited in full toward the project if you sign within 60 days. |
| Server hardware alone | From about $5,300 | Dell's online starting price for its entry tower (T360) and rack (R360) servers, with 32 GB of memory, one 2 TB drive, a one-year warranty, and no operating system. Most business builds add memory, drives, and a longer warranty. |
Server memory and storage prices moved sharply in 2026, so hardware is priced at the time of your quote. These are typical ranges, not a quote. Your price is confirmed in writing after the inventory.
Sources: Microsoft: products ending support in 2027, Microsoft: plan for Windows Server 2016 end of support, Windows Server pricing, Dell PowerEdge T360, Dell PowerEdge R360.
What are the Windows Server 2016 end-of-support dates?
Microsoft publishes the lifecycle dates below. They set the window you are planning against: the server keeps running after end of support, but it stops getting security fixes unless you pay for Extended Security Updates.
| Milestone | Date | What it means |
|---|---|---|
| Extended support ends | January 12, 2027 | After this date Windows Server 2016 gets no more security updates unless you buy Extended Security Updates. |
| ESU enrollment opens (Azure Arc) | August 3, 2026 | Extended Security Updates enabled by Azure Arc can be configured from this date; billing begins January 13, 2027. |
| ESUs available for | Up to 3 years | ESUs provide Critical and Important security updates through 2030. They include no new features and no non-security fixes, and are a paid bridge, not a destination. |
These are Microsoft's published lifecycle dates, not a Days Dynamics commitment. Confirm your own eligibility and licensing before relying on an ESU bridge.
Sources: Microsoft: plan for Windows Server 2016 end of support, Microsoft: Extended Security Updates enabled by Azure Arc.
What to check before you move a Windows Server 2016 workload
Most failed migrations trace back to a compatibility check that was skipped. Work through these before you commit to a path.
- Every application on the server, and written confirmation from each vendor that it supports your target version.
- Whether the server is clustered: Microsoft supports in-place upgrade for nonclustered servers, and clusters upgrade one version at a time.
- The roles and features in use, since in-place upgrade supports only roles and features that are upgrade-eligible.
- A full backup with a tested restore before anything moves, not just a backup that reports success.
- The number of users and devices that connect, which sets the access licenses the new server needs.
- A maintenance window long enough for the upgrade or cutover, with a rollback plan if something does not start.
Replace, move to Azure, consolidate, or bridge: which path?
There is rarely one right answer across a fleet. The path is chosen server by server, against what runs on each one. This is how the options compare.
| Path | Best when | What to watch |
|---|---|---|
| Replace on site | A workload performs better on a local server, or hardware is near the end of its life and a like-for-like refresh is simplest. | Hardware lead times tighten close to the deadline, and server memory and storage prices moved sharply in 2026. |
| Move to Microsoft Azure | File storage, email-adjacent, or workloads that scale up and down, where you would rather pay monthly than buy hardware. | Some practice-management, ERP, or point-of-sale systems run better on site; check vendor support before assuming a lift-and-shift. |
| Consolidate | Several lightly used 2016-era servers could run as virtual machines on one modern host. | Licensing and backup design change when you consolidate; size the host for peak, not average. |
| Bridge with ESUs | A server genuinely cannot move before January 12, 2027 and needs covered security updates while a larger project is planned. | ESUs are paid and time-limited, require eligible licensing, and the plan should still end with the workload moved. |
Decision guidance, not a recommendation for your environment. The right path depends on what each server runs, which the inventory step confirms.
Windows Server 2016 replacement on site in the Las Vegas valley
Days Dynamics is headquartered in Las Vegas and works on site across Las Vegas, Henderson, North Las Vegas, and Boulder City. For a Windows Server 2016 replacement, that means in-person planning with leadership and IT, installation at your office, and a cutover scheduled after hours, with hardware, licensing, migration, and cutover managed as one project.
- Ten servers or fewer? Start with the free Server and Firewall Support Check: which ones lose support and when.
- The Windows Server 2016 Decision Snapshot gives up to 10 servers a recommended path and a budget range in five business days, for a fixed $1,500.
- Server replacements and cutovers scheduled after hours, with a tested restore and a rollback plan.
- A 30-minute planning call, by phone or in person in the Las Vegas valley.
- Projects outside the valley are handled remotely with local installation help.
How does the process work?
The first three steps are the same for every engagement and are described in full on how it works. The last two are where this service does its specific work.
- 1Tell us what you're working throughThe readiness assessment asks how many servers are involved, what runs on them, and whether a renewal, audit, or insurer is setting the timing.
- 2See your priorities from the quizYou see the likely priority areas before any contact details are requested.
- 3Book a planning call if it makes senseA 30-minute conversation covering what each server does, which applications depend on it, and which dates the business cannot move.
- 4Inventory and choose a path per serverWe document each server's roles and applications, check vendor support for the new version, and recommend replace, cloud, consolidate, or bridge, with costs for each.
- 5Supply, migrate, and cut overHardware and licensing are ordered once the plan is approved. Data and applications move after a verified backup, and the old server is retired only after the new one is confirmed working.
What should you decide before buying anything?
- Which applications on the server have to keep running, and who supports each one.
- Whether each workload belongs on new hardware on site or in the cloud.
- How many users and devices connect, which sets the access licenses you need.
- How long the business can tolerate the server being offline during cutover.
- Whether a paid Extended Security Updates bridge is worth it while a larger project is planned.
- What happens to the old hardware and the data on its drives.
Common mistakes worth avoiding
- Waiting until the end-of-support date, when hardware lead times and installer schedules are tight.
- Upgrading in place without checking whether the business application supports the new version.
- Migrating without a tested restore, so the first sign of a problem is lost data.
- Forgetting access licenses, which are bought separately from the server license.
- Moving everything to the cloud by default when one application performs better on site, or the reverse.
Related solution families
Project-level planning pages where you can configure a quote request for a specific piece of this work.
Where to read more
Frequently asked questions
What happens if we keep running Windows Server 2016 after January 12, 2027?
The server keeps working, but Microsoft stops releasing security fixes for it unless you buy Extended Security Updates. New vulnerabilities stay open, and insurers and auditors may treat an unsupported server as a gap.
We know it has to move. We just don't have the people. Can you run the whole thing?
Yes. Days Dynamics plans the move, supplies the hardware and licensing, and runs the cutover after hours with a tested backup and a rollback plan. Your team approves each step instead of doing the work.
Is paying for Extended Security Updates a reasonable way to buy time?
For a server that genuinely cannot move before January 12, 2027, it can be. Extended Security Updates are a paid, time-limited bridge, not a destination, and the plan should still end with the workload moved.
Can we just upgrade the existing server?
Sometimes. If the hardware is supported and the applications run on the new version, an in-place upgrade can work. Many 2016-era servers are also near the end of their hardware life, which is why replacement is often the better value.
Should we move to the cloud instead?
For some workloads, yes. File storage and email usually move well. Some practice management, ERP, or point-of-sale systems run better on a local server. The plan is made server by server.
How long does a server replacement take?
Most of the time goes into inventory, ordering, and staging. The cutover itself is usually an evening or a weekend. Starting early leaves room for hardware lead times before the deadline.
Do you replace Windows Server 2016 servers on site in Las Vegas?
Yes. Days Dynamics is headquartered in Las Vegas and works on site across Las Vegas, Henderson, North Las Vegas, and Boulder City: in-person planning with leadership and IT, installation at your office, and a cutover scheduled after hours.
Related pages
If that server had to move next month, who would do the cutover, and what is the rollback plan?
The quiz takes about two minutes and shows your likely priorities on screen, before any contact details.
Already know what you need? Start a quote request and we will come back with real options.