Construction, Engineering, and Architecture IT in Las Vegas

How Las Vegas construction, engineering, and architecture firms plan jobsite trailer connectivity, field tablets, CAD workstations, large CAD and BIM file sharing, project file backups, Microsoft 365, and the safeguarding clauses on federal projects.

Planning guidesOwners, operations leads, IT managers, and project executives at construction, engineering, and architecture firms in Las Vegas, North Las Vegas, and Boulder CityBy , Founder and CEO, Days Dynamics. Published November 10, 2026.

What IT a Las Vegas construction or design firm needs to plan for

Construction, engineering, and architecture firms need IT that works in two places: the office, where large CAD and BIM files are made, and the field, where crews work from jobsite trailers and tablets. Plan four things: connectivity at each jobsite, managed mobile devices, file sharing sized for large models, and tested backups of project files. Firms with federal contracts must also meet the safeguarding clauses those contracts include, such as FAR 52.204-21 or DFARS 252.204-7012.

What these firms run, and where it gets harder

Most of the systems are the same ones any office runs. The difference is that work moves between the office, temporary jobsites, and outside parties such as owners, consultants, and subcontractors.

AreaWhat it usually includesWhy it is harder for these firms
Field connectivityInternet and Wi-Fi for jobsite trailers and temporary officesSites are temporary, change with each project, and may have no wired service at first
Mobile devicesTablets and phones for drawings, photos, punch lists, and daily reportsDevices leave the office, get lost or damaged, and may be shared across crews
CAD and BIM workstationsDesktops and laptops running AutoCAD, Revit, and other design toolsEach software release sets its own Windows and hardware requirements
Project filesDrawings, models, submittals, and photosFiles are large, versions multiply, and outside parties need access
Microsoft 365Email, Teams, SharePoint, and OneDriveSharing with outside parties is constant, so access drifts over time
Contract securitySafeguarding clauses on public and federal workRequirements come from each contract and can flow down to subcontractors

Jobsite trailers and field connectivity

Treat each jobsite as a small temporary branch office. It needs an internet connection, a firewall, Wi-Fi for the trailer, and a plan to move or return the equipment when the project ends. Order connectivity early, because a provider's install schedule, not yours, decides when a wired circuit arrives.

OptionWhat it involvesUsually fits when
Cellular router (LTE or 5G)A business router with one or more carrier SIMs, plus an external antenna where signal is weakThe site is short term or has no wired service yet
Wired business internetA provider installs a circuit to the trailer or temporary officeThe project runs long enough to justify the install and a provider serves the address
Fixed wireless or satelliteAn antenna on the trailer or a pole links to a provider's network or a satellite serviceWired service is not available and cellular signal is poor
Two connections with failoverA primary and a backup link on one firewall that switches between themDaily reports, plan downloads, or trailer phones cannot wait for an outage to clear
  • One standard build. Use the same firewall and Wi-Fi setup at every trailer, so each site is set up, moved, and returned the same way.
  • Separate networks. Keep guest and subcontractor Wi-Fi apart from company laptops, printers, and cameras.
  • Remote management. Make sure the office can monitor and update the equipment at each site.
  • Cabling by a licensed contractor. In Nevada, the C-2d low voltage systems subclassification in NAC 624.200 covers installing computer networking systems. Hire a licensed contractor for any cable runs and check the license with the Nevada State Contractors Board license search. Days Dynamics does not install cabling. It plans, sources, and configures the network equipment and coordinates installation with your licensed contractor.
  • Closeout. Plan how equipment comes back from a finished site, gets wiped, and is reused on the next one.

See the Network and Wi-Fi services.

Tablets and phones in the field

Field devices carry drawings, photos, and project data, and they get lost. Manage them centrally so each one is set up the same way and company data can be removed. Microsoft Intune is a cloud-based endpoint management service. Its supported platforms include Android, iOS/iPadOS, and Windows, and Microsoft states that a lost or stolen device can be wiped.

  • Enroll every company device. Company-owned tablets and phones go into device management before they go to the field.
  • Decide on personal phones. If crews use their own phones, protect the company apps and data. Microsoft states that Intune can selectively wipe organization data without touching personal content.
  • Plan for weak signal. Autodesk's help for the Autodesk Forma mobile app says users can sync and download a project to an iOS or Android device and work with downloaded files even when offline. Have crews sync before they head to a site with poor coverage.
  • Storage and charging. Size device storage for the drawing sets crews carry, and plan charging in the trailer and the truck.
  • Durability. Choose cases or rugged models for the dust, drops, and heat the device will actually see.
  • Lost device process. Write down who reports a lost device, who wipes it, and where the replacement comes from.

See the Hardware and device refresh services.

CAD workstations and Windows versions

Each Autodesk release publishes its own requirements, so check the page for the exact version before you buy or upgrade workstations. Revit 2027 lists 64-bit Windows 11 only. Microsoft ended Windows 10 support on October 14, 2025. Autodesk's Revit requirement pages also publish configuration tiers, from an entry-level minimum up to a performance tier for large, complex models. Requirements below were checked November 2026.

Product or versionWhat the vendor publishesSource
Revit 2027Operating system: 64-bit Microsoft Windows 11Autodesk
Revit 2026Operating system: 64-bit Microsoft Windows 10 v1809 or later, or Windows 11Autodesk
AutoCAD 2026Operating system: 64-bit Microsoft Windows 11 and Windows 10Autodesk
Windows 10 (Home, Pro, Enterprise, Education)End of support: October 14, 2025Microsoft Lifecycle
  • Match the release. Check the requirements page for each Autodesk release your teams run, because requirements change between releases.
  • Size for the biggest models. Spec memory, graphics, and storage from Autodesk's higher tiers for people who open the largest models, and the entry tier only for light users.
  • Check add-ins first. Confirm that plugins and other design tools support a new release before you upgrade.
  • Plan Windows 10 replacements. List every remaining Windows 10 workstation and set a date to upgrade or replace each one.

See the Windows 10 end of support for businesses.

Large CAD and BIM files: what Autodesk and Microsoft publish

Large model files test the limits of office networks and file sync tools, so check what the vendors publish before you choose where project files live. Autodesk states that Revit file-based worksharing is not designed for use on a WAN and was designed for a LAN. A central model on an office server therefore does not suit people working from jobsites or other offices. Limits below were checked November 2026.

ProductWhat the vendor publishesWhat it means for planning
Revit file-based worksharingNot designed for use on a WAN; designed for a LAN. Autodesk gives no network guidelines for that setupPlan a different setup for people outside the office
Revit Cloud WorksharingLets team members author Revit models in the cloud at the same time; workshared models are stored on Autodesk DocsConfirm your Autodesk subscription and each user's internet connection before moving models
Autodesk Desktop ConnectorNeeds free disk space of at least three times the data set size during uploadSize workstation drives for uploads, not only for the files
SharePoint and OneDrive250 GB upload limit per file; Microsoft recommends syncing no more than 300,000 files in a single library; full path up to 400 charactersPlan folder depth and sync scope, not only file size
  • One home per file type. Hypothetical example: models in Autodesk Docs, contracts and correspondence in SharePoint. Write the rule down so staff do not keep second copies on desktops.
  • Short folder paths. The full decoded path in SharePoint and OneDrive, including the file name, cannot exceed 400 characters.
  • Sync only what people need. Microsoft recommends syncing no more than 300,000 files in a single OneDrive or team site library for optimum performance.
  • Deliberate outside sharing. Give owners, consultants, and subcontractors access per project, and remove it at closeout.
  • Offline work with care. Autodesk's Desktop Connector help says files must be downloaded before working offline, offline changes sync as new versions when back online, and if the file also changed in the cloud, the cloud change has priority.

See the Microsoft 365 licensing and migration.

Backing up project files

Back up project files wherever they live: the office server, Microsoft 365, and project data in cloud collaboration tools. A sync tool or recycle bin is not a backup. In SharePoint, deleted items are kept in the recycle bins for 93 days from deletion and then permanently deleted.

  • List every place project data lives. Include file servers, SharePoint, OneDrive, Teams, Autodesk Docs, and laptops in the field.
  • Keep one copy separate. Hold at least one backup copy apart from your everyday accounts, so one compromised login cannot delete both.
  • Check what each cloud tool restores. Ask each vendor what it can restore and for how long, and cover the gap with a separate backup where needed.
  • Test restores. Restore a full project folder and a large model on a schedule, time it, and record the result.
  • Retention. Keep closed project files as long as your contracts and advisors require.

See the Backup and disaster recovery.

Security requirements on public and federal projects

Security requirements on public work come from the contract. On federal contracts, FAR 52.204-21 sets 15 basic safeguarding requirements for contractor systems with federal contract information. On Defense contracts, DFARS 252.204-7012 covers covered defense information, which it defines by reference to the Controlled Unclassified Information (CUI) Registry, and applies NIST SP 800-171. Both clauses flow down to subcontractors in the cases they describe. Confirm your requirements with your contracting officer.

RequirementPublished byWhat it coversKey points
FAR 52.204-21Federal Acquisition RegulationContractor systems with federal contract information15 basic requirements, such as limiting access to authorized users and sanitizing media before disposal. Flows down to subcontracts where that information may reside or transit
DFARS 252.204-7012 (May 2024)Defense Federal Acquisition Regulation SupplementContractor systems with covered defense informationNIST SP 800-171 requirements; report cyber incidents to DoD within 72 hours of discovery; preserve images of affected systems for at least 90 days from the report; flows down to subcontracts for operationally critical support or that involve covered defense information
NIST SP 800-171National Institute of Standards and TechnologyProtecting CUI in nonfederal systems and organizationsRevision 3 published May 2024. Revision 2 withdrawn May 14, 2024. Ask your contracting officer which revision applies

Which revision of NIST SP 800-171 applies

DFARS 252.204-7012 applies the version in effect when the solicitation is issued, or as authorized by the contracting officer. A withdrawn revision can still be the one a contract names, so ask your contracting officer.

Cloud services that hold covered defense information

The clause requires the contractor to ensure that a cloud provider storing covered defense information meets security requirements equivalent to the FedRAMP Moderate baseline. Microsoft offers GCC High for eligible organizations holding or processing DoD CUI, after an eligibility validation process. Its DoD environment is for Department of Defense entities only. Ask your contracting officer and your cloud provider which environment your contracts call for.

Incident reporting

Cyber incidents are reported to DoD at dibnet.dod.mil, and reporting requires a DoD-approved medium assurance certificate. Get the certificate before an incident, not during one.

What Days Dynamics does and does not do

Days Dynamics can help plan and set up the IT your own advisors specify, such as Microsoft 365 settings, multifactor authentication, device management, and backups. It does not provide legal advice, compliance assessments, CMMC services, or certification, and it does not attest to compliance.

See the Cybersecurity and resilience.

Construction and design firm IT checklist

Use this list before a new project mobilizes or before an IT project. Days Dynamics is based in Las Vegas and works on site across Las Vegas, North Las Vegas, and Boulder City. Days Dynamics plans, sources, and configures equipment and coordinates installation. It does not do cabling or other contractor work and holds no contractor license, so a licensed contractor handles cable runs.

  • Inventory. List every workstation, laptop, tablet, phone, trailer network, and cloud service, with its operating system and support date.
  • Jobsite standard. Define one connectivity, firewall, and Wi-Fi build for trailers, and how it is set up, moved, and returned.
  • Connectivity lead time. Order internet for a new site as early as the project schedule allows.
  • Devices. Enroll every field device in management and write down the lost device process.
  • Workstations. Check each Autodesk release you run against its published requirements, and list Windows 10 machines to replace or upgrade.
  • Files. Decide where each type of project file lives, keep folder paths short, and review outside sharing at closeout.
  • Microsoft 365. Require multifactor authentication, keep admin accounts separate, and review guest access in Teams and SharePoint.
  • Backups. Back up servers, Microsoft 365, and cloud project data, keep one copy separate, and test a restore.
  • Contracts. For each public or federal contract, list the safeguarding clauses, confirm the requirements with the contracting officer, and name an owner for each.

Frequently asked questions

Can a jobsite trailer run on cellular internet alone?

It can, for a short project with usable signal. Test signal where the trailer will sit, add an external antenna where signal is weak, and add a second connection if an outage would stop daily work.

Can we open a Revit central model from a jobsite over VPN?

Autodesk states that Revit file-based worksharing is not designed for use on a WAN and that the potential for operation failures increases with latency. For people outside the office, plan a different setup, such as Revit Cloud Worksharing.

Is SharePoint a good place for CAD files?

It can hold them. Microsoft's upload limit is 250 GB per file, and Microsoft recommends syncing no more than 300,000 files in a single library. Models that several people edit at once are better handled in the design software's own collaboration tools, such as Revit Cloud Worksharing for Revit models.

Do we need NIST SP 800-171 for a federal project?

Only if your contract requires it. DFARS 252.204-7012 applies NIST SP 800-171 to contractor systems with covered defense information on Defense contracts. Other federal contracts may include FAR 52.204-21. Read the clauses in your contract and confirm with your contracting officer.

Does Days Dynamics provide CMMC assessments or certification?

No. Days Dynamics does not offer CMMC services, compliance assessments, or legal advice. It can help plan and set up the IT your own advisors specify, such as Microsoft 365 settings, device management, and backups.

Does Days Dynamics install network cabling at jobsites?

No. Days Dynamics does not do cabling or other contractor work and holds no contractor license. It plans, sources, and configures network equipment and coordinates installation with your licensed contractor.

Does Days Dynamics work on site in North Las Vegas?

Yes. Days Dynamics works on site across Las Vegas, North Las Vegas, and Boulder City.

Plan office and jobsite IT with Days Dynamics

Send us your offices and active jobsites, the design software and versions you run, where project files live today, and any security clauses in your contracts. We will map each item to a path and a sequence that fits your project schedule. A planning call is planning support, not a quote, an audit, or a commitment on licensing, availability, or delivery dates.

Sources

Primary sources checked when this guide was written. Dates and product status can change, so confirm on the source before you rely on them.

Planning this project now?

Turn the checklist into a plan

The 2-minute IT quiz turns this checklist into ranked priorities for your situation, before any contact details.